Specifications
Foundation
RCC Foundation
Structure
Reinforced cement concrete frame with hollow/solid cement blocks in fill walls
Flooring
Virtrified tiles for the entire apartment with skirting, Entrance lobby in vitrified tiles, Staircase & common area will be of ceramic tile flooring.
Glazed Tiles
Glazed tiles upto a height of 5’ on toilet walls.Glazed tiles upto a height of 2’ above the kitchen counter.
Kitchen
Single-bowl stainless steel sink and tap. Exhaust fan provision.
Toilet Fittings
white sanitary ware including European water closet and wash basin.(Cera or equivalent). Good quality chromium plated taps, mixers and showers.(Cera or equivalent).
Hardware
Best quality hardware.
Doors
Decorative paneled entrance door in hard wood. Molded compressed doors for bedrooms.PVC extruded section door for toilets.
Windows
Fully glazed powder coated aluminum windows with MS Grills.
Painting
Putty finished emulsion paint for internal walls and enamel paint for doors and window grills. External walls will be emulsion painted.
Water Supply
KWA water supply through sump and over head tank in the kitchen Subject to rules and regulations of KWA.Ground water supply from open well
Electricity Supply 5 amps
Concealed copper wiring(V-Guard,Vinay,Polycab etc). Adequate light points, fan points,and 15 amps points etc. with independent meters for each flat.Modular type switches.Provisions for single phase electrical supply. Provisions for cable TV in living room.Telephone conduit point in living room.